Gas Dehydration & Booster Station Utilities

Code Date City Fees Register
OG008 April 14, 2024 - April 18, 2024 Bangkok $ 5000

Register Course..

OG008 July 21, 2024 - July 25, 2024 Berlin $ 5000

Register Course..

OG008 October 13, 2024 - October 17, 2024 Online $ 1500

Register Course..

OG008 January 19, 2025 - January 23, 2025 Dubai – UAE $ 5000

Register Course..

________________________________________________________________________________________________

Objectives

This course identifies the function of each component of Gas dehydration and desalting plants , operational aspects , different treating methods , use of chemicals and problem troubleshooting . Also the participants will Learn how to operate booster station utilities by understanding the functions and specifications of booster stations and utilities operation & the Purging procedures and Site precautions.

The Delegates

The course is designed for engineers , technical, operating and supervisory staff and all Senior production operators , Junior production engineers .

The Contents

  • Introduction and Course overview.
  • Basic theory of dehydrating .
  • Dewatering Technology
  • Theory of hydrates.
  • Technologies used for dehydration.
  • Dehydration by absorption.
  • Dehydration by permeation.
  • Dehydration by refrigeration.
  • Hysys Simulation package.
  • Water content of natural Gas.
  • Glycol solutions
  • Use of glycol solutions.
  • Minimum strong TEG concentration.
  • TEG circulation in mackowice dehydration facility.
  • Hysys simulations .
  • Functions of Booster Stations :
  • Using Booster Station with Gathering Centres.
  • Separation the condensate.
  • Dehydrates (removes water) from both compressed gas and condensate.
  • Receives and dehydrates condensates from the Gathering Centers.
  • Specifications of Booster Stations :
  • System components overview .
  • Instrument assembly .
  • System installation .
  • System enclosures .
  • Piping and valves .
  • System control .
  • Practical cases.
  • Packaged Booster Stations :
  • Pit less Boosters .
  • Pumps – Motors – Control Panel – Isolation valves .
  • Constant Pressure Booster Systems:
  • Components of pressure Booster system .
  • Pac-monitor Flow Sensor .
  • Control panel .
  • Suction and Discharge Pressure Gauges .
  • Hydro pneumatic Tanks .
  • Pressure Regulating Valves .
  • Practical cases.
  • Pumping Equipment and Appurtenances:
  • Pumping capacity requirements.
  • General pump, motor and wiring installation requirements.
  • Line−shaft vertical turbine pumps.
  • Submersible vertical turbine pumps.
  • Motor protection.
  • Pump variable output control devices.
  • Well appurtenances.
  • Pump discharge lines .
  • Practical cases
  • Purging procedures in Booster Stations:
  • General procedures .
  • Purging procedures .
  • Direct purging instructions .
  • Site precautions .
  • Purging procedures .
  • Purging volume and flow rate .
  • Case study and workshop.

 Notes:

  • Great Discount for companies and governmental Organizations .
  • All programs are held in five star hotels .
  • All lecturers have sufficient knowledge and experience to implement the programs at an optimal level .
  • Large package of services is offered to the participants .

The Discount

10% in case of Three P. (or more)

2024-04-24T18:27:55+00:00