Code | Date | City | Fees | Register |
---|---|---|---|---|
OG008 | April 14, 2024 - April 18, 2024 | Bangkok | $ 5000 |
Register Course.. |
OG008 | July 21, 2024 - July 25, 2024 | Berlin | $ 5000 |
Register Course.. |
OG008 | October 13, 2024 - October 17, 2024 | Online | $ 1500 |
Register Course.. |
OG008 | January 19, 2025 - January 23, 2025 | Dubai – UAE | $ 5000 |
Register Course.. |
________________________________________________________________________________________________
Objectives
This course identifies the function of each component of Gas dehydration and desalting plants , operational aspects , different treating methods , use of chemicals and problem troubleshooting . Also the participants will Learn how to operate booster station utilities by understanding the functions and specifications of booster stations and utilities operation & the Purging procedures and Site precautions.
The Delegates
The course is designed for engineers , technical, operating and supervisory staff and all Senior production operators , Junior production engineers .
The Contents
- Introduction and Course overview.
- Basic theory of dehydrating .
- Dewatering Technology
- Theory of hydrates.
- Technologies used for dehydration.
- Dehydration by absorption.
- Dehydration by permeation.
- Dehydration by refrigeration.
- Hysys Simulation package.
- Water content of natural Gas.
- Glycol solutions
- Use of glycol solutions.
- Minimum strong TEG concentration.
- TEG circulation in mackowice dehydration facility.
- Hysys simulations .
- Functions of Booster Stations :
- Using Booster Station with Gathering Centres.
- Separation the condensate.
- Dehydrates (removes water) from both compressed gas and condensate.
- Receives and dehydrates condensates from the Gathering Centers.
- Specifications of Booster Stations :
- System components overview .
- Instrument assembly .
- System installation .
- System enclosures .
- Piping and valves .
- System control .
- Practical cases.
- Packaged Booster Stations :
- Pit less Boosters .
- Pumps – Motors – Control Panel – Isolation valves .
- Constant Pressure Booster Systems:
- Components of pressure Booster system .
- Pac-monitor Flow Sensor .
- Control panel .
- Suction and Discharge Pressure Gauges .
- Hydro pneumatic Tanks .
- Pressure Regulating Valves .
- Practical cases.
- Pumping Equipment and Appurtenances:
- Pumping capacity requirements.
- General pump, motor and wiring installation requirements.
- Line−shaft vertical turbine pumps.
- Submersible vertical turbine pumps.
- Motor protection.
- Pump variable output control devices.
- Well appurtenances.
- Pump discharge lines .
- Practical cases
- Purging procedures in Booster Stations:
- General procedures .
- Purging procedures .
- Direct purging instructions .
- Site precautions .
- Purging procedures .
- Purging volume and flow rate .
- Case study and workshop.
Notes:
- Great Discount for companies and governmental Organizations .
- All programs are held in five star hotels .
- All lecturers have sufficient knowledge and experience to implement the programs at an optimal level .
- Large package of services is offered to the participants .
The Discount
10% in case of Three P. (or more)