Code | Date | City | Fees | Register |
---|---|---|---|---|
OG017 | June 16, 2024 - June 27, 2024 | Bangkok | $ 9000 |
Register Course.. |
OG017 | September 1, 2024 - September 5, 2024 | Dubai – UAE | $ 5000 |
Register Course.. |
OG017 | December 29, 2024 - January 2, 2024 | Online | $ 1500 |
Register Course.. |
OG017 | March 2, 2025 - March 6, 2025 | Cairo - EGYPT | $ 4000 |
Register Course.. |
________________________________________________________________________________________________
Objectives
- By the end of this Course participants will be able to:
- Specify water quality requirements for a water injection project
- Simulate the impact of water quality on injector performance
- Make facilities decisions to ensure good long-term well injectivity
- Conduct diagnosis of water production problems
- Identify potential sources of produced water
- Select possible remediation methods for water shutoff
- Choose facilities to better handle produced water shutoff
- Test injection wells to identify injection profiles
- Select injection well patterns for optimizing waterfloods
- Simulate the impact of thermal effects on injection well performance
- Evaluate the impact of growing fractures on waterflood performance
- Empower with an overview on the different water treatment methods .
The Delegates
Reservoir, production, and surface facilities engineers responsible for providing reservoir engineering support, facilities planning and drilling/completions recommendations for oil and gas assets, engineers , Controller and other personnel involved in providing equipment and chemicals for diagnosing / reducing water production, improving injector performance and treating produced water .
The Contents
- Day One :
- Introduction: Causes of excess water production
- Data collection for problem identification
- Identifying the causes of excess water production
- Wellbore and near-wellbore water shutoff technologies
- Gels for water shutoff
- Polymer flooding
- Day Two:
- Down-hole sink technology
- Selection of water control treatment
- Analysis and treatment of produced water
- Scale, bacteria and corrosion problems
- Day Three :
- Injection well testing
- Water quality requirements for re-injection and surface disposal
- Fractured injection wells
- Day Four :
- Injection into unconsolidated sands (with sand control)
- Impact of water re-injection on reservoir performance
- Economics and post treatment analysis
- Day Five :
- Water sampling and analysis
- Chemical and physical properties
- Qualitative analysis oil field
- Oil in water analysis
- Suspended solid analysis
- Particle size analysis
- Water quality
- Turbidity
- Field water analysis
- Course summary.
The Discount
10% in case of Three P. (or more)